Qualification at the Supplier
The gage or measurement system should be given a full dimensional layout and functional test, where applicable, at the measurement
Preventive Maintenance Considerations
What activities should be scheduled for preventive maintenance (e.g., lubrication, vibration analysis, probe integrity, parts replacement, etc.) Much of these
Datum Coordination
Ideally, with the current prevalence in the use of Geometric Dimensioning & Tolerancing (GD&T), datums need to be coordinated (i.e.,
A few additional questions to consider in relation to measurement planning:
Who ought to be involved in the “needs” analysis? The flow chart and initial discussion will facilitate the identification
Criteria for a Measurement Process Design Selection
Before a measurement system can be purchased, a detailed engineering concept of the measurement process is developed. Using the purpose
Measurement Life Cycle
The Measurement Life Cycle concept expresses the belief that the measurement methods may change over time as one learns and
Measurement Strategy and Planning
Planning is key and Measurement Strategy before designing and purchase of measurement equipment or systems. Many decisions made during the
Process Setup/ Control (Funnel Experiment)
Often manufacturing operations use a single part at the beginning of the day to verify that the process is targeted.








Pretty component of content. I just stumbled upon your weblog and in accession capital to say that I acquire actually…
When I originally commented I clicked the "Notify me when new comments are added" checkbox and now each time a…